Another item that we were able to mark off the to-do list; gray water drainage ditch dug, lines run and connected to the tank. We now have both the septic lines connected (we dug those as soon as we had the basement foundation poured) and the gray water connected. The septic tank itself was dug before we move into the existing house we are now living in. Then we had the lines in place to connect at a later time.
Inside basement view of lines |
Last year, we dug another tank on the back side of the new house for the gray water so that all the other water drainage from the washer, sinks, and showers would not fill up our septic tank as quickly.
This is definitely a good thing to get done before the weather turns colder. Now, all of our necessary digging and outside work is done! Well, until Spring comes around. Then we have some serious landscaping to do!