Showing posts with label drywall lift. Show all posts
Showing posts with label drywall lift. Show all posts

Thursday, July 14, 2011

Moisture Barrier

With the upstairs ceiling insulation foamed in place and given a few days to set, David began stapling the moisture barrier in place. This process was fairly simple and quickly completed. He was able to use a drywall lift, which he again fabricated himself, to assist him with the larger pieces since we tried to keep either no seams or as few as possible in each room. 

.


These are just a few photos to show how we put the drywall lift to use already. 


Related Posts Plugin for WordPress, Blogger...